New Main Street Student and Technology Center

​​​The new 19,000-square-foot student and technology center will house additional instructional space, computer​ labs with faculty and staff offices. The new on site cafeteria with open eating areas will meet the needs of the students and staff.  Large open lobby spaces at both first and second levels with Internet computer stations on the main level for student use. 

   

From top left: 1) El Centro's student center opened in November 2004; view of new addition facing south. 2) Exterior view of green area with terrace seating and outdoor art sculpture provide street appeal. 3) Students can access the internet with the new internet cafe in the lobby. 4) Art gallery at reception station in the lobby. 5) Student center provides food services for ​student convenience. 6) Second level rotunda lounge area. 7) Lounge at second level. 8) Architectural rendering of new student and technology center.